May 1999 It is to this date that the township of Rennes-Le-Château decided the setting in yard of the works of the gardens of the church. These works were achieved in two phases. The first concerning the Virgin's garden, the second, the garden of Mount Calvary. A necessary restoration was achieved of the underground cave of Bérenger Saunière, or so-called underground cave" Of the Bench ". .
June 1999 This period is dedicated to the setting in yard of the second slice of works. It concerns the planning of the belvédère of the village and the Christ du Calvaire. The creation of the low wall on the belvédère has permitted to secure the sides of the tray, permitting the creation of a mad guard necessary to the security of the visitors thus. As for the actual Christ, its restoration was necessary, but maybe not of the happiest.
August 2003 This date is only the finality of an adventure of two years. Since this time of numerous rumors circulated to Rennes-Le-Château on possible excavations and on their results. Of excavations they became investigatings by electronic measures of the soils of the church and the Tower Magdala. Finally it is during this month that the first results fell! They surprised more of one of them
April 2004 Decidedly, the events taking place to Rennes-Le-Château take the turns of scandals more and more. Under pretexts all falser the some that the other, the township of the township decides the constructions of a mausoleum for Bérenger Saunière